PROPOSAL
A template is provided for you for both the document and schedule [Word File] [Excel File].
REPORT
A FINAL REPORT TEMPLATE [Word File] is included for your use but is not required.
PRESENTATIONS
You can NOT exceed the assigned time (for 2008 - 11 minutes per group) under any circumstances. Practice your presentation - meeting the time constraint is 90% of your presentation grade. A good rule of thumb is 1 minute per slide. Briefly introduce your project and move quickly to results and recommendations. Read the presentation tips from ITE and these suggestions from Dr. Felder.
Project PPTs and Reports can be uploaded via this web page. Note they will not show linked below until I move the files. Please try to have PPTs uploaded 1 hour before Dec 3's class.
Current Projects
| ID | Name | PPT | REPORT |
1 |
Bicycle Scramble | PPT | |
2 |
Seven Corners Redesign | PPT | |
3 |
I-205/Sunnyside NB Onramp | PPT | |
4 |
Parking Structure Demand | PPT | |
5 |
Pedestrian Behavior at Curb Bulbouts | PPT | |
6 |
Trip Generation Study | PPT | |
8 |
Ped/Bike Safety @ Kelly Naito | PPT | |
10 |
SW 4th Bike Lane | PPT | |
11 |
Hart and Sorrento Roads | PPT |
Past Projects
2007 |
|||
| ID | Project | PPT | REPORT |
| 9A | Streetcar arrival validation | PPT | |
| 9B | Streetcar arrival validation | PPT | |
| 10 | Parking maneuvers | PPT | |
| 6 | Mitchell point tunnel options | PPT | |
| 8 | Sandy River pedestrian and bicycle bridge | PPT | |
| 3 | Effectiveness of modifications at SE Powell & 82nd | PPT | |
| 7 | Floating walkway for the HCRH | PPT | |
| 4A | Traffic control issues on SW Broadway between Mill and Hall | PPT | |
| 5 | Prioritization for bikes at Broadway intersections | PPT | |
| 4B | Traffic control issues on SW Broadway between Mill and Hall | PPT | |
2006 |
||||
Project Name |
Sponsor |
Presentation |
Report |
|
| Canyon Lane, Canyon Drive and 87th Avenue | City of Beaverton | |||
| Scholls Ferry Rd and Barows | Washington Cty | |||
| Beavercreek Road and Meyers | Clackamas Cty | |||
| Bike scramble signal | COP | |||
| Establishing a measure of pedestrian activity | COP | |||
| Crosswalk SW 4th Ave and College | PSU | |||
| Trip gen for mixed use development | City of LO | |||
| Wildwood | PPR | |||
2005 |
||||
Project Name |
Sponsor |
Presentation |
Report |
|
| Fanno Creek Trail, Tigard | City of Tigard, METRO |
|||
| Fanno Creek Trail, Durham | City of Tigard, METRO |
|||
| Willamette River Ferry, Rose Quarter | City of Portland |
|||
| Willamette River Ferry, Docks | City of Portland |
|||
| I-205/OR-212/OR-224 Truck Operations | Clackamas County |
|||
| Saturation flow at Pearl District Intersections | City of Portland |
|||
| Bicycle Observation in Downtown | City of Portland |
|||
| MAX @ 20 years | PSU |
|||